Foam concrete is a lightweight cementitious material produced by incorporating preformed foam into a cement-based slurry.

When supported by project design and appropriate testing, it may be used for non-structural floor filling, level adjustment, and selected renovation applications.

Its density can be adjusted through mix design, but the material must still satisfy the relevant strength, deformation, substrate, and subsequent flooring requirements.

1. Confirm Project Requirements

Before construction, establish:

  • Filling area and design thickness
  • Structural and substrate load requirements
  • Finished levels and tolerances
  • Target dry density and compressive strength
  • Subsequent floor construction and service loads
  • Utility installations and construction joints
  • Available water, power, and site access

Applications involving special loads or structural requirements should be reviewed by the project designer.

2. Substrate Preparation

Inspect the substrate and remove debris, loose materials, and standing water where required by the construction specification.

Protect service installations and openings as appropriate.

Establish level control points and determine the planned placement sequence.

3. Mix Design Verification

Conduct trials using the actual local raw materials.

Evaluate fresh density, dry density under specified conditions, compressive strength at the required age, workability, and other relevant performance characteristics.

The selected mix should be verified against the project requirements before routine placement.

4. Foam Generation and Mixing

Prepare preformed foam using a compatible foaming agent and foam generator.

Produce the cementitious slurry according to the verified mix design, then introduce the foam using the approved mixing procedure.

DWELLFOAM FG-series foam generators are designed for foam production. Separate suitable equipment is required for slurry mixing and finished foam concrete delivery.

Monitor foam stability, mixture uniformity, and fresh density during production.

5. Placement and Level Control

Plan Placement Sections

Organize work areas according to filling thickness, project size, production capacity, and site conditions.

Monitor Fresh Material

Check fresh density and mixture condition according to the quality control plan.

Control Thickness and Levels

Use suitable level control methods to achieve the required filling thickness and finished elevation.

Consider Site Conditions

Temperature, weather, waiting time, and delivery conditions may affect the material and should be addressed in the construction plan.

6. Curing and Subsequent Work

Cure the material according to the selected mix, environmental conditions, and project requirements.

Do not begin operations that may damage the filling layer before the specified strength, moisture condition, and other acceptance criteria are achieved.

Compatibility with subsequent flooring, waterproofing, or other layers should also be confirmed.

7. Quality Verification

The inspection plan should include:

  • Raw material and mix records
  • Fresh density measurements
  • Filling thickness and finished levels
  • Surface defects or local settlement
  • Required strength and dry density testing
  • Conditions for subsequent floor construction

8. Frequently Asked Questions

What causes local settlement?

Possible factors include slurry instability, foam loss, unsuitable mix proportions, placement procedures, and curing conditions. The cause should be investigated before corrective action.

Can foam concrete serve as the final floor surface?

This depends on the design and intended service conditions. Ordinary lightweight filling should not automatically be treated as a finished wear-resistant flooring layer.

How is the filling thickness determined?

Thickness must follow the project design rather than being selected solely from material density.

9. DWELLFOAM Technical Support

DWELLFOAM supplies foam concrete foaming agents, FG-series foam generators, and material compatibility guidance.

For project assistance, please provide the filling area, design thickness, target density, strength requirements, local materials, and construction conditions.

Need technical support?Contact us